East Rockingham Waste to Energy Project

Project Overview:

The East Rockingham Waste to Energy Project (ERWtE) represents a significant milestone in renewable energy and waste management, designed to process 300,000 tonnes of residual waste annually. This state-of-the-art facility aims to divert 96% of waste from landfill, delivering a cost-effective treatment solution while contributing to dispatchable renewable energy supply. Altrad (formerly AusGroup) was engaged to fabricate, pre-assemble, and install critical components of the boiler hall, baghouse, and hoppers, leveraging its expertise in modular construction and onsite assembly.

Scope:

Altrad’s responsibilities for this project included:

  • Receiving and verifying materials using advanced tracking systems (Track Base).
  • Specialist fabrication and welding of structural steel components.
  • Pre-assembly of eight modular structures (cubes) for the bag and boiler house.
  • Installation of specialised fabric filters and insulation on hoppers.
  • Pre-assembling transportable modules such as cubes, towers, and panels.
  • Comprehensive planning for the transportation envelope, ensuring safe delivery from the Kwinana fabrication facility to the site. Including the management of burrying powerlines.
  • Execution of all onsite installation, including scaffolding and rope access services.

Manning:

  • Expertise in fabrication, structural assembly, and specialist onsite installation techniques
  • Peak manning:30 personnel

Outcomes:

  • Successfully completed the fabrication, pre-assembly, and installation tasks within the scheduled timeframe.
  • Delivered high-quality modular structures, ensuring seamless onsite integration with minimal rework required.
  • Contributed to the facility’s ability to achieve 96% waste diversion from landfills, supporting sustainability objectives.
  • Leveraged Altrad’s specialised expertise and infrastructure at the Kwinana Operations facility, ensuring efficient project execution.
  • Maintained a high standard of safety and quality, with zero significant incidents reported during the project duration.
  • Enhanced client trust by meeting complex logistical and technical requirements, reinforcing Altrad’s reputation for delivering integrated specialist solutions.
Client

Acciona

Location

East Rockingham, Western Australia

Duration

February 2021 – December 2021

Service Capabilities
Fabrication Solutions

Talk to us about your next project

Wherever you are on your operational journey, our specialist resource is ready to meet your every need. Get in touch, today.