Tubridgi Gas – Compressor Installation

Project Overview:

The Tubridgi Gas Storage Project repurposed the existing Griffin Export Facility (GEF) to enable injection and extraction of natural gas from the previously exhausted Tubridgi Gas Field. This transformation involved drilling five new wells and enhancing the facility with additional compression and processing infrastructure to provide 30 TJ/day input and extraction capacity. Altrad (formerly Valmec) was engaged to install two secondhand compressor packages and aftercoolers, leveraging its expertise to deliver a cost-effective and efficient solution while meeting stringent client specifications.

Scope:

  • Installation of two Exterran compressor skid packages and aftercoolers.
  • SMP and E&I works ensuring compliance with project and client specifications.

Challenges and Solutions:

  • Secondhand Equipment: Installing two secondhand compressor packages cost-effectively required innovative approaches and precise execution.
  • Compliance and Precision: Ensured adherence to client specifications through meticulous attention to detail by both SMP and E&I teams, ensuring operational integrity.

Outcomes:

Project Overview:

The Tubridgi Gas Storage Project repurposed the existing Griffin Export Facility (GEF) to enable injection and extraction of natural gas from the previously exhausted Tubridgi Gas Field. This transformation involved drilling five new wells and enhancing the facility with additional compression and processing infrastructure to provide 30 TJ/day input and extraction capacity. Altrad (formerly Valmec) was engaged to install two secondhand compressor packages and aftercoolers, leveraging its expertise to deliver a cost-effective and efficient solution while meeting stringent client specifications.

Scope:

  • Installation of two Exterran compressor skid packages and aftercoolers.
  • SMP and E&I works ensuring compliance with project and client specifications.

Challenges and Solutions:

  • Secondhand Equipment: Installing two secondhand compressor packages cost-effectively required innovative approaches and precise execution.
  • Compliance and Precision: Ensured adherence to client specifications through meticulous attention to detail by both SMP and E&I teams, ensuring operational integrity.

Outcomes:

  • Delivered a streamlined and efficient installation, meeting all project requirements and timelines.
  • Leveraged Altrad’s deep experience with Exterran compressor packages to enhance execution efficiency.
  • Reinforced Altrad’s reputation for adaptability and precision in delivering oil and gas infrastructure projects.

Client

DBP Group

Location

Onslow, Western Australia

Duration

30 Weeks Completion: September 2017

Industry
Energy Utilities